THE ROUTE SURVEY OF PART OF SABON FEGI ALONG QUEEN MARYAM STREET, DAMATURU METROPLOLIS.
Abstract
ABSTRACT
This project report presents formal approaches to the Surveying application in route survey of Queen Maryam Damaturu metropolis. The project focuses on providing the route survey plan of both the longitudinal and cross-sectional profiling for determining the optimum use of the plan in the project site. The plan of the study area was obtained, through the use of DGPS, which include the rover and the base station to generate the coordinate and the elevation (height). AutoCAD software version 2016 was used to plot the vertical and the horizontal alignment profile with a suitable scale of 1:500 and 1:250 for longitudinal profile, then 1:250 and 1:200 for vertical and horizontal alignment, the plan contain all the information needed to guide and direct all the executors in the site. The study area covers from queen Maryam to Muspoly junction were many undulation has been found in the project site.
Full-Text Access Notice
In accordance with the NERD Policy on promoting peer-reviewed publication, public access to the full text of a project, thesis or dissertation is restricted for three years, allowing the author and supervisors sufficient time to pursue peer-reviewed publication.
During this period, researchers with legitimate academic or research purposes may request authorisation directly from the author to enable NERD to release the indexed full texts of the work using the form below.